PROJECT OVERVIEW
To replace exising timber bridge with a stronger and wider concrete structure over Lochaber Creek on the Burnett Highway south of Eidsvold.
CLIENT NAME
Dept of Main Roads[Wide Bay Region]
TOTAL VALUE OF PROJECT
$9.76M
CONTRACT TYPE
TICO -Schedule of Rates
PROJECT DURATION
2019-2020
DETAILED SCOPE AND DESCRIPTION
ATC Consulting Engineers were involved with Main Roads to embark on a major bridge replacement project that would see effectively a new stronger and wider concrete structure being constructed.
The 78 year old wooden bridge over Lochaber Creek on the Burnett Highway south of Eidsvold was replaced with a 3 x 19m span concrete bridge including:
- Bored Piles using screw in liners
- Construction of columns and headstocks
- Erection of pre-cast deck units
- Construction of deck wearing surface and bridge barrier
During construction a temporary side-track diversion was in place to keep the Burnett Highway moving. As part of the project, a realignment and upgrade to Malmoe Road intersection, just north of the bridge, to provide better visibility when accessing the highway was undertaken.
- Granular widening of existing approaches
- AC and bitumen surfacing
- Extension of existing culverts and installation of temporary culvert under side-track
- Installation of guardrail
- Erosion and sediment control & revegetation
The full scope of ATC Consulting Engineers involvement in the project included:
- Project Management and Delivery
- Contract Administration
- Technical guidance and support to the Principal
- Onsite Engineering supervision
- Review quality data
- Leadership and management of the project
PROJECT OUTCOMES
The project was a success bringing multiple benefits across a whole range or areas